Project Description

This was a Non-8(a) award for the Defensive Logistic Agency with the purpose of upgrading the existing panels in buildings 20, 29, 232, and 100 to new Eaton distribution panels. This project also included supplying and installing new aluminum light poles with LED fixtures along the fence line