Replace Concrete Steps & Install Lights Bolio & Taylor Gates, POM

This project was an 8(a) award for the US Department of the Army for the removal of existing and replacement of the unsafe concrete steps and walkway between buildings 620 and 619, and installation of electrical lightings to the guard booths at PVT Bolio and Taylor Gates at the Presidio of Monterey.